Pouring Footings

<- last   home   next ->



Looking to the southeast and behind the two construction personnel in the image, one can see the graded and prepared building pad.  The pad is the location on which the new addition will sit.  This image captures the early pouring of the concrete footings that will form the outline of the building at the ground level and provide support for the structural walls.  The poured concrete needed approximately 30 days to set and was tested to ensure that it had cured sufficiently to provide the support needed for the walls and building structure.