Polychlorinated Biphenyls (PCB) Documents
The Government Information, Maps and Microform Services Department (East Tower 2 or ET2) at Indiana University has acquired and received documents relating to the Polychlorinated Biphenyls (PCB) issues in Bloomington Indiana and Monroe County. These documents span the early 1980’s to most recent.
To locate PCB information, search the spreadsheet below for the document number. The documents can be accessed on the 2nd floor of the Herman B Wells Library. Other documents may be cataloged and located through the use of IUCAT. The Monroe County Public Library also serves as a depository for these materials at: http://www.monroe.lib.in.us/indiana_room/pcb.html
|
PCB TITLES | |
|
PCB-1 |
CERCLIS : A Data Base |
|
PCB-2 |
The Superfund Process |
|
PCB-3 |
Pathways of Contamination |
|
PCB-4 |
Information on PCB Contamination Bloomington, Indiana Monroe County |
|
PCB-5 |
CV’s of individuals [no title given] |
|
PCB-6 |
Principles of Risk Assessment : A Nontechnical Review |
|
PCB-7 |
Site Selection Process. Phase 4A : A Selection of a Preferred Site(s); Generic Risk Assessment Volume 1 |
|
PCB-8 |
ATSDR Public Health Assessment Guidance Manual |
|
PCB-9 |
Oxidation-Induced Temperature Rise in Landfills |
|
PCB-10 |
Interim Guidance on Compliance with Applicable or Relevant and Appropriate Requirements |
|
PCB-11 |
The Risk Assessment Guidelines of 1986 |
|
PCB-12 |
Superfund Program Fact Sheet : Major Roles and Responsibilities for Remedial Cleanup Activities at the Bloomington PCB Sites; Bloomington, Indiana December 1987 |
|
PCB-13 |
40 CFR Ch.1 (7-1-88 Edition) Part 761- Polychlorinated Biphenyls (PCBs) Manufacturing, Processing, Distribution in Commerce, and Use Prohibitions |
|
PCB-14 |
Bloomington Bio-safety Manual : Summary of Guidelines and Reporting Requirements for Recombinant DNA and Biohazardous Material Activities on the Bloomington Campus of Indiana, University; prepared by The Bloomington Campus Biosafety Committee, January, 1989 |
|
PCB-15 |
[Letter from Margo F. Blackwell to City of Bloomington Utilities Service Board; Letter from Indiana State Representative to Indiana Department of Environmental Management; newspaper clippings and journal articles] |
|
PCB-16 |
A Management Review of the Superfund Program |
|
PCB-17 |
How to Obtain Superfund Information [Quick Reference Fact Sheet] 1990 |
|
PCB-18 |
Proposal to Conduct a U.S. EPA Diagnostic/Feasibility Study of Lake Monroe, Indiana; Submitted on behalf of the Monroe County Commissioners December 17, 1990 |
|
PCB-19 |
19 – PCB Compliance Guide for Electrical Equipment 1991 Edition |
|
PCB-20 |
20 - National Priorities List Sites: Indiana 1991 |
|
PCB-21 |
Elements of Risk Assessment - EPA |
|
PCB-22 |
Draft: Toxicological Profile for Polychlorinated Biphenyls; Prepared by Syracuse Research Corporation Under Subcontract to Clement International corporation; Prepared for U.S. Department of Health and Human Services, Public Health Services, Agency for Toxic Substances and Disease Registry October 1991 |
|
PCB-23 |
23 - United States environmental Protection Agency Region 5 Public Information Center Bloomington, IN : Index of Information Files, media Loan Library List, Selected Books and Guides List June 1992 |
|
PCB-24 |
24 – OSHA Site Supervisor ERTC Emergency Reponse Training Center the University of Findlay Indlay, Ohio July 1992 |
|
PCB-25 |
Use of the Dispersion by Chemical Reaction (DCR) Process for Successful Solid-Phase Dehalogenation of PCBs in Clay Soil |
|
PCB-26 |
[Letter from Municipal Waste Technology Section to Sound Environmental Services, Inc.; Letter from Emergency and enforcement Response Branch to Technical Support Center (Las Vegas, NV)] |
|
PCB-27 |
[Selected New York Times articles] |
|
PCB-28 |
Estimating Exposure to Dioxin-Like Compounds Volume 1: Executive Summary [Review Draft (do not cite or quote)] |
|
PCB-29 |
Health Assessment Document for 2, 3, 7, 8-Tetrachlorodibenzo-p-Dioxin (TCDD) and Related Compounds Volume III of III [Review Draft (do not cite or quote)] |
|
PCB-30 |
Reassessment of 2,3,7,8-Tetrachlorodibenzo-p-dioxin |
|
PCB-31 |
Proceedings of the Expert Panel Workshop to Evaluate the Public Health implications of the Treatment and Disposal of Polychlorinated Biphenyls-Contaminated Waste |
|
PCB-32 |
Proposed and Interim Guidelines for Carcinogen Risk Assessment [Review Draft] |
|
PCB-33 |
Alternative Remedy Development Process |
|
PCB-34 |
[Missing Documents to Westinghouse Administrative Record] |
|
PCB-35 |
Proposed Bloomington-PCB Degree: A Condensed Version and Overview |
|
PCB-36 |
In the United States District Court for the Southern District of Indiana Indianapolis Division: Civil Action No. IP 83-9-C Judge William E. Steckler and Civil Action No. IP 81-448-C Judge S. Hugh Dillin |
|
PCB-37 |
Bloomington Project General Site Safety Plan Interim Remedial Activites [WTSD – TMS-111 Rev. 0] |
|
PCB-38 |
[Letters from Bloomington Project Manager (Westinghouse Electric Corporation)] |
|
PCB-39 |
Bloomington Project Quarterly Report August 22, 1985 through October 10, 1985 |
|
PCB-40 |
[Certification of insurance coverage for Westinghouse Electric Corporation] |
|
PCB-41 |
Well Water User Survey Around Four PCB-Contaminated Sites |
|
PCB-42 |
Bloomington Project Quarterly Report [submitted by Westinghouse Electric Corporation] |
|
PCB-43 |
[Investigations of Division of Land Pollution Control Staff review and comments by Westinghouse Electric Corporation] |
|
PCB-44 |
Bloomington Project Quarterly Report 1/1/86 - 3/31/86 [submitted by Westinghouse Electric Corporation] |
|
PCB-45 |
United States District Court Southern District of Indiana Indianapolis Division: Civ. No. IP 83-9-C Judge S. Hugh Dillin |
|
PCB-46 |
Community Relations Plan, Bloomington Sites, Bloomington, Indiana 1987 [Final Draft] |
|
PCB-47 |
[Letter from Valdas Adamkus, Regional Administrator, United States Environmental Protection Agency to Honorable Lee Hamilton, House of Representatives] |
|
PCB-48 |
Information Update : Westinghouse Permit Applications Review Process; Bloomington, Indiana August 1991 |
|
PCB-49 |
49 - Consent Decree party technical meetings held November 4, 1993 and November 9, 1993. |
|
PCB-50 |
50 – Public Health Assessment for Bloomington PCB Sites Bloomington, Monroe County, Indiana and Spencer, Owen County, Indiana April 1994 Volume I of II |
|
PCB-50 |
50 – Public Health Assessment for Bloomington PCB Sites Bloomington, Monroe County, Indiana and Spencer, Owen County, Indiana April 1994 Volume I of II (copy #2) |
|
PCB-51 |
Final Report Preliminary Data Evaluation and Pathway Analyses Report for Consent Decree PCB Sites April 1994 |
|
PCB-51 |
Final Report Preliminary Data Evaluation and Pathway Analyses Report for Consent Decree PCB Sites April 1994 (copy #2) |
|
PCB-51 |
Final Report: Preliminary Data evaluation and Pathway Analyses Report for Consent Decree PCB Sites |
|
PCB-52 |
Community Relations Plan Earth tech EPA Contract No. 68-W8-0079; Westinghouse Consent Decree Superfund Sites Community Relations WA No. 22-5BZZ Project No. 04022.11 |
|
PCB-53 |
Joint Consent Decree Party Community Relations Plan : PCB Contaminated Superfund Sites, Bloomington, Indiana, September 1994 |
|
PC``B-54 |
Public Health Assessment for Bloomington PCB Sites, Bloomington, Monroe County, Indiana and Spencer, Owen County, Indiana September 29, 1994 Volume II of II |
|
PCB-55 |
Feasibility Study of Alternative PCB Treatment Technologies for Six Sites in Bloomington, Indiana (final report)June 27, 1995 |
|
PCB-56 |
Westinghouse Electric Corporation, Bloomington, Monroe County, Indiana, Feasibility Study, September 1995 |
|
PCB-57 |
57 - Public Health Assessment for Bloomington PCB Sites Bloomington, Monroe County, Indiana and Spencer, Owen County, Indiana April 1997 Revised November 15, 1996 Volume I of III |
|
PCB-57 |
57(2) - Public Health Assessment for Bloomington PCB Sites Bloomington, Monroe County, Indiana and Spencer, Owen County, Indiana April 1997 Revised November 15, 1996 Volume I of III (copy #2) |
|
PCB-57 |
Public Health Assessment for Bloomington PCB Sites Bloomington, Monroe County, Indiana and Spencer, Owen County, Indiana, April 1994; Revised November 15, 1996 Volume I of III |
|
PCB-58 |
Public Health Assessment for Bloomington PCB Sites Bloomington, Monroe County, Indiana and Spencer, Owen County, Indiana, November 15, 1996 Volume II of III |
|
PCB-59 |
Public Health Assessment for Bloomington PCB Sites Bloomington, Monroe County, Indiana and Spencer, Owen County, Indiana, November 15, 1996 Volume III of III |
|
PCB-60 |
New Directions; Issue Three/Winter 1996 |
|
PCB-61 |
Bloomington Sites Cleanup Status, June 1999 |
|
PCB-62 |
Westinghouse Facility Administrative Order [EPA fact sheet, May 1989] |
|
PCB-63 |
[Review of Westinghouse Electric Corporation facility, under Comprehensive Environmental Response, Compensation and Liability Act (CERCLA); June 1989] |
|
PCB-64 |
Westinghouse Plant Site Update [fact sheet, July 1989] |
|
PCB-65 |
[Letters from United States Environmental Protection Agency, Region 5; sample soil analyses] |
|
PCB-66 |
[Letters from United States Environmental Protection Agency, Region 5; well samples] |
|
PCB-67 |
[Letter from United States Environmental Protection Agency, Region 5 to Westinghouse Electric Corporation, August 31, 1989] |
|
PCB-68 |
Revised Work Plan I, 300 North Curry Pike Facility, Bloomington, Indiana |
|
PCB-69 |
[Letter from Westinghouse Electric Corporation and U.S. Environmental Protection Agency, October 5, 1989] |
|
PCB-70 |
[Letter from U.S. Environmental Protection Agency to Westinghouse Electric Corporation, October 18, 1989] |
|
PCB-71 |
[Letter from U.S. Environmental Protection Agency to Westinghouse Electric Corporation, October 24, 1989] |
|
PCB-72 |
Excavation Plan, Removal of Soil Containing PCBs, Westinghouse Facility, Town of Bloomington, Monroe County, Indiana |
|
PCB-73 |
ABB Plant Cleanup Continues [fact sheet, May 1992] |
|
PCB-74 |
ABB Plant Cleanup Continues [fact sheet, September 1993] |
|
PCB-75 |
Laidlaw Environmental Services, Inc. Proposal to: Westinghouse Electrical Corporation; for the Transportation and Disposal for Impacted Material from the Interim Storage Facility at ABB in Bloomington, Indiana) March 27, 1995 |
|
PCB-76 |
Site-Specific Health and Safety Plan, ABB Plant Site Bloomington, Indiana; Prepared for Westinghouse Electric Corporation; Prepared by PSARA Technologies, Inc. |
|
PCB-77 |
Air Monitoring Plan, ABB Plant Site Bloomington, Indiana; Prepared for Westinghouse Electric Corporation; Prepared by PSARA Technologies, Inc. April 1995 |
|
PCB-78 |
Technical Proposal for Excavation and Loadout of the Interim Storage Facility at the Asea Boveri Brown Power T&D Plant, Bloomington, Indiana; Submitted to Westinghouse Electric Corporation; Prepared by Westinghouse Remediation Services April, 20 1995 |
|
PCB-79 |
Notice of Opportunity to Comment on the Requirements for Treatment Alternatives for the Disposal of Contaminated Soils and Materials from the Fell Iron and Metal Sire in Bloomington, Indiana |
|
PCB-80 |
[Updates on Westinghouse Superfund sites in and around Bloomington, Indiana; December 20, 988] |
|
PCB-81 |
Air Monitoring at Fairview Elementary School [fact sheet, January 1989] |
|
PCB-82 |
TAT Sampling Locations/Results 1/10/89 |
|
PCB-83 |
Ground Water Monitoring Program Fell Iron and Metal Site Bloomington Indiana February 1989 |
|
PCB-84 |
Fell Iron [Chain of Custody Record; Project number 89WT01] |
|
PCB-85 |
Flexible Membrane Liner/Cap Containment System [fact sheet, April 1989] |
|
PCB-86 |
Soil Cleanup Technologies Recommended, (Engineering Evaluation and cost Analysis) Fell Iron and Metal Inc. [fact sheet, September 1989] |
|
PCB-87 |
Fell Iron and Metal Engineering Evaluation/Cost Analysis [fact sheet, September 1989] |
|
PCB-88 |
The Engineering Evaluation/Cost Analysis Process (EE/CA) At the Fell Iron Superfund Site |
|
PCB-89 |
Engineering Evaluation/Cost Analysis Fell, Iron and Metal, Bloomington, Indiana; Prepared for U.S. Environmental Protection Agency; Contract No. 68-01-7367, TAT-05-G2-00968, TDD No. 5-8811-20; Prepared by Weston – Major Programs technical Assistance Team, Region V |
|
PCB-90 |
US EPA TES IV Contract No. 68-01-7351, Work Assignment No. C05015 Draft Community Relations Plan for Fell Iron and Metal Site Bloomington, IN September 1989 |
|
PCB-91 |
Review of Proposed Removal Plan and Engineering Evaluation and Cost Analysis (EECA) for the Fell Iron and Metal Site in Bloomington, Indiana |
|
PCB-92 |
U.S. Environmental Protection Agency Workshop for Fell Iron and Metal Evaluation and Cost Analysis, Held on October 10 and 11, 1989 at Environmental Protection Agency Region r Public Information Center, 212 Fountain Square, Bloomington, Indiana 47401, Volume I |
|
PCB-93 |
U.S. Environmental Protection Agency Workshop for Fell Iron and Metal Evaluation and Cost Analysis, Held on October 10 and 11, 1989 at Environmental Protection Agency Region r Public Information Center, 212 Fountain Square, Bloomington, Indiana 47401, Volume II |
|
PCB-94 |
U.S. Environmental Protection Agency Workshop for Fell Iron and Metal Evaluation and Cost Analysis, Held on October 10 and 11, 1989 at Environmental Protection Agency Region r Public Information Center, 212 Fountain Square, Bloomington, Indiana 47401, Volume III |
|
PCB-95 |
U.S. Environmental Protection Agency Workshop October 26, 1989 : Excerpts from comments made during the Workshop held in Rm. 222, Fountain Square, Bloomington, Indiana on the above date from 1:00 p.m. through 5:00 p.m. |
|
PCB-96 |
U.S. Environmental Protection Agency Workshop October 26, 1989 : Excerpts from comments made during the Workshop held in Rm. 222, Fountain Square, Bloomington, Indiana on the above date from 7:00 p.m. through 9:00 p.m. |
|
PCB-97 |
Fell Iron and metal, Sampling Activity, Bloomington, Indiana TDD #5-8811-20 [correspondence from Roy F. Weston, Inc. and U.S. Environmental Protection Agency, October 12, 1989; sample analyses] |
|
PCB-98 |
Fell EE/CA Public Comments (Citizens Information Committee Agenda, room 212, Fountain Square, Bloomington, Indiana January 11, 1990 7:00 pm) |
|
PCB-99 |
Hazardous Substances Questionnaire, Citizens Involvement Committee, Bloomington, Indiana (Citizens Information Committee Agenda, room 212, Fountain Square, Bloomington, Indiana January 11, 1990 7:00 pm) |
|
PCB-100 |
Community relations Plan for Fell Iron and Metal Site, Bloomington, Indiana; October 1990 |
|
PCB-101 |
Supplemental On-Site Remedy ARARs Public Comment Period : Fell Iron and metal Superfund Site [fact sheet, December 1991] |
|
PCB-102 |
Ground Water Monitoring Report, Fell Iron and Metal Site, Bloomington, Indiana; Third Quarter 1992, August 17, 1992; Prepared for Westinghouse Electric Corporation; Prepared by SEC Donahue Inc. of North Carolina |
|
PCB-103 |
Ground Water Monitoring Report, Fell Iron and Metal Site, Bloomington, Indiana; Fourth Quarter 1992, November 16, 1992; Prepared for Westinghouse Electric Corporation; Prepared by SEC Donahue Inc. of North Carolina |
|
PCB-104 |
Ground Water Monitoring Report, Fell Iron and Metal Site, Bloomington, Indiana; First Quarter 1993, February 23, 1993; Prepared by Westinghouse Electric Corporation |
|
PCB-105 |
U.S. Environmental Protection Agency Region V In the Matter of: Fell Iron and Metal, Inc. Bloomington, Indiana; Administrative Order Pursuant to Section 106 (a) of the Comprehensive Environmental Response, Compensation and Liability Act of 1980, As Amended, 42 U.S.C. Section 9606(a) |
|
PCB-106 |
Ground Water Monitoring Report, Fell Iron and Metal Site Bloomington, Indiana Second Quarter 1993, May 27, 1993; Prepared by Westinghouse Electric Corporation |
|
PCB-107 |
Ground Water Monitoring Report, Fell Iron and Metal Site Bloomington, Indiana Fourth Quarter 1993, November 15, 1993; Prepared by Westinghouse Electric Corporation |
|
PCB-108 |
Ground Water Monitoring Report, Fell Iron and Metal Site Bloomington, Indiana Second Quarter 1994, May 25, 1994; Prepared by Westinghouse Electric Corporation |
|
PCB-109 |
Ground Water Monitoring Report, Fell Iron and Metal Site Bloomington, Indiana Third Quarter 1994, August 25, 1994; Prepared by Westinghouse Electric Corporation |
|
PCB-110 |
Ground Water Monitoring Report, Fell Iron and Metal Site Bloomington, Indiana First Quarter 1995, February 22-23, 1995; Prepared by Westinghouse Electric Corporation |
|
PCB-111 |
Ground Water Monitoring Report, Fell Iron and Metal Site Bloomington, Indiana Second Quarter 1995, May 24, 1995; Prepared by Westinghouse Electric Corporation |
|
PCB-112 |
Health Consultation : Fell Iron and Metal Incorporated (Fell Iron and Metal Facility and Asea Brown Boveri Plant) Bloomington, Monroe County, Indiana; CERCLIS No. IND016208795 |
|
PCB-112 |
Health Consultation : Fell Iron and Metal Incorporated (Fell Iron and Metal Facility and Asea Brown Boveri Plant) Bloomington, Monroe County, Indiana; CERCLIS No. IND016208795 (copy #2) |
|
PCB-113 |
PCB Emissions Calculations for the Winston-Thomas Lagoon |
|
PCB-114 |
A Summary Report on Conditions at the Winston-Thomas Wastewater Treatment Facility, Bloomington, Indiana; Prepared for U.S. Environmental Protection Agency; Prepared by EARTH TECH (Bloomington, IN), January 1996 |
|
PCB-115 |
Alternative Evaluation Report : Winston Thomas Wastewater Treatment Facility, Bloomington, Indiana, September 1996 |
|
PCB-116 |
Conceptual Work Plan for Remediation of Drying Beds and Digesters: Winston Thomas Wastewater Treatment Facility, Bloomington, Indiana, May 22, 1997 |
|
PCB-117 |
Remedial Work Plan for Remediation of Drying Beds and Digesters at the Winston Thomas Water Treatment Facility in Bloomington, Indiana |
|
PCB-118 |
Draft of 12/17/97: Draft Statement of Work – for the Design and Removal Actions at the Winston-Thomas Wastewater Treatment Plant in Bloomington, Indiana |
|
PCB-119 |
Winston Thomas Treatment Plant Engineering Evaluation/Cost Analysis (EE/CA) Meeting |
|
PCB-120 |
Draft of 4/24/98: Draft Statement of Work – for the Design and Removal Actions at the Winston-Thomas Wastewater Treatment Plant in Bloomington, Indiana |
|
PCB-120 |
Draft of 4/24/98: Draft Statement of Work – for the Design and Removal Actions at the Winston-Thomas Wastewater Treatment Plant in Bloomington, Indiana (copy #2) |
|
PCB-121 |
Action Memorandum: Documenting U.S. EPA Region 5’s selection and approval of non-time critical CERCLA Removal Action for the Tertiary Lagoon, Abandoned Lagoons, and Trickling Filter at the Winston Thomas Sewage Treatment Plant, Bloomington, Indiana |
|
PCB-121 |
Action Memorandum: Documenting U.S. EPA Region 5’s selection and approval of non-time critical CERCLA Removal Action for the Tertiary Lagoon, Abandoned Lagoons, and Trickling Filter at the Winston Thomas Sewage Treatment Plant, Bloomington, Indiana (copy #2) |
|
PCB-122 |
Stipulation Concerning removal measures for selected portions of Winston-Thomas |
|
PCB-122 |
Stipulation Concerning removal measures for selected portions of Winston-Thomas (copy #2) |
|
PCB-123 |
Westinghouse Bloomington Project Supplemental Groundwater Investigation Plan Winston-Thomas Facility and Bennett’s Dump |
|
PCB-123 |
Westinghouse Bloomington Project Supplemental Groundwater Investigation Plan Winston-Thomas Facility and Bennett’s Dump (copy #2) |
|
PCB-124 |
Report: Supplemental Hydrogeologic Investigation Plan Winston Thomas Facility & Bennett’s Dump February 1986 |
|
PCB-125 |
Letter: From United States Environmental Protection Agency Region 5 to Carl Anderson, Bloomington Project Manager April 14, 1986 |
|
PCB-126 |
Report: Supplemental Hydrogeologic Investigation Palan Winston Thomas Facility & Bennett’s Dump May 1986 |
|
PCB-127 |
Report: Supplemental Hydrogeologic Investigation Plan Winston Thomas Facility & Bennett’s Dump August 1986 |
|
PCB-128 |
Report: Quarterly Ground-water sampling results: Quarterly Sampling event 3 of 4 September 5-8, 1988, Bennett’s Dump and Winston Thomas Facility Supplemental Hydrogeologic Investigation Bloomington, Indiana October 1988 |
|
PCB-129 |
Report: Quarterly Ground-water sampling results: Quarterly Sampling event 4 of 4 December 5-7, 1988, Bennett’s Dump and Winston Thomas Facility Supplemental Hydrogeologic Investigation Bloomington, Indiana January 1989 |
|
PCB-130 |
U.S. EPA Recommends Cleanup Plan Bennett’s Dump and Neal’s Dump Monroe/Owen Counties, Indiana August 1988 |
|
PCB-131 |
Bennett’s and Neal’s Dump Proposed Plan Public Meeting Thursday, September 10, 1988 7:00 p.m. |
|
PCB-132 |
Lithologic Cross-Section I Neal’s Dump October 15, 1985 |
|
PCB-132 |
Lithologic Cross-Section I Neal’s Dump October 15, 1985 (copy #2) |
|
PCB-133 |
Neal’s Dump Upper Saturated Sand Ground-water Contour Map October 15, 1985 |
|
PCB-133 |
Neal’s Dump Upper Saturated Sand Ground-water Contour Map October 15, 1985 (copy #2) |
|
PCB-134 |
Neal’s Dump On-site Ground-water Monitoring Well Location Plot Map October 15, 1985 |
|
PCB-134 |
Neal’s Dump On-site Ground-water Monitoring Well Location Plot Map October 15, 1985 (copy #2) |
|
PCB-135 |
Neal’s Dump Groundwater Data PCB’s October 15,1985 |
|
PCB-135 |
Neal’s Dump Groundwater Data PCB’s October 15,1985 (copy #2) |
|
PCB-135 |
Neal’s Dump Groundwater Data PCB’s October 15,1985 (copy #3) |
|
PCB-136 |
Report: On-site Ground-water monitoring plan Neal’s dump January 1986 |
|
PCB-137 |
Report: On-site Ground-water monitoring plan Neal’s dump May 1986 |
|
PCB-138 |
Ground water monitoring report Neal’s dump Owen County, Indiana 1991 Pre-removal monitoring events 7 through 12 June through November 1991 and Report of Investigation |
|
PCB-139 |
Ground water monitoring report Neal’s Dump Owen County, Indiana Pre-removal monitoring Event 13 of 15 May 12-13, 1992 |
|
PCB-140 |
Ground water monitoring report Neal’s Dump Owen County, Indiana Pre-removal monitoring Event 14 of 15 November 18-19, 1992 |
|
PCB-141 |
Ground water monitoring report Neal’s Dump Owen County, Indiana Semi-Annual Pre-removal monitoring Event 15 of 15 May 26-27, 1993 |
|
PCB-142 |
Ground water monitoring report Neal’s Dump Owen County, Indiana Semi-Annual Pre-removal monitoring Event 16 November 18-19, 1993 |
|
PCB-143 |
Lithologic Cross-section 2 Neal’s Landfill October 15, 1985 |
|
PCB-143 |
Lithologic Cross-section 2 Neal’s Landfill October 15, 1985 (copy #2) |
|
PCB-144 |
Lithologic Cross-section 3 Neal’s Landfill October 15, 1985 |
|
PCB-144 |
Lithologic Cross-section 3 Neal’s Landfill October 15, 1985 (copy #2) |
|
PCB-145 |
Lithologic Cross-section 4 Neal’s Landfill October 15, 1985 |
|
PCB-146 |
Lithologic Cross-section 4 Neal’s Landfill October 15, 1985 (copy #2) |
|
PCB-146 |
Lithologic Cross-section 8 Neal’s Landfill October 15, 1985 |
|
PCB-146 |
Lithologic Cross-section 8 Neal’s Landfill October 15, 1985 (copy #2) |
|
PCB-147 |
Groundwater contour map September 1983 |
|
PCB-147 |
Groundwater contour map September 1983(copy #2) |
|
PCB-148 |
Proposed On-site Ground-water monitoring well location plot plan & cross section location October 15, 1983 |
|
PCB-148 |
Proposed On-site Ground-water monitoring well location plot plan & cross section location October 15, 1983 (copy #2) |
|
PCB-149 |
Bloomington Project Conard’s Branch Excavation Plan WTSD – TME-124 Rev. 0 |
|
PCB-150 |
Report: On-site Ground-Water Monitoring Plan Neal’s Landfill Volume 1 of 2 April 1986 |
|
PCB-151 |
Report: On-site Ground-Water Monitoring Plan Neal’s Landfill Volume 2 of 2 April 1986 |
|
PCB-152 |
Bloomington Project Conard’s Branch Excavation Plan WTSD – TME-124 Rev. 1 April 18, 1986 |
|
PCB-153 |
Ground water monitoring report Neal’s Landfill Monroe County, Indiana Semi-annual pre-removal monitoring Event 6 of 15 November 21, 1991 |
|
PCB-154 |
Ground water monitoring report Neal’s Landfill Monroe County, Indiana Semi-annual pre-removal monitoring Event 7 of 15 May 19-20, 1992 SEC Project No. RE253.00 |
|
PCB-154 |
Ground water monitoring report Neal’s Landfill Monroe County, Indiana Semi-annual pre-removal monitoring Event 7 of 15 May 19-20, 1992 SEC Project No. RE253.00 (copy #2) |
|
PCB-155 |
Ground water monitoring report Neal’s Landfill Monroe County, Indiana Semi-annual pre-removal monitoring Event 8 of 15 November 17-18,, 1992 |
|
PCB-156 |
Ground water monitoring report Neal’s Landfill Monroe County, Indiana Semi-annual pre-removal monitoring Event 9 of 15 May 25, 1993 |
|
PCB-157 |
Ground water monitoring report Neal’s Landfill Monroe County, Indiana Semi-annual pre-removal monitoring Event 12 of 15 December 12-13, 1994 |
|
PCB-158 |
U.S. EPA Proposes Changes to the Source Control Remedy for Neal’s Landfill December 1998 |
|
PCB-158 |
U.S. EPA Proposes Changes to the Source Control Remedy for Neal’s Landfill December 1998 (copy #2) |
|
PCB-159 |
Neal’s Landfill Source Control Remedy Public Meeting Wednesday, January 27, 1999 7:00 p.m. |
|
PCB-160 |
Westinghouse Bloomington Project On-site Ground-watre Monitoring Plan Lemon Lane, Neal’s Dump, and Neal’s Landfill |
|
PCB-161 |
Memorandum: Indiana/TDD RS-8109-O3H Bloomington/Lemon Lane and Neal’s Landfills –Dioxin Sampling |
|
PCB-162 |
Summary of Modifications to approval of the Westinghouse project safety plan – health risk based action levels and the most stringent engineering controls |
|
PCB-163 |
Bloomington Project Lemon Lane Landfill Interim removal and remedial measures plan for grading and covering WTDS-TME-110 REV 0 |
|
PCB-164 |
Lithologic cross-section Lemon Lane October 15, 1985 Figure LL-IA |
|
PCB-165 |
Lithologic cross-section Lemon Lane October 15, 1985 Figure LL-IB |
|
PCB-166 |
Lithologic cross-section Lemon Lane October 15, 1985 Figure LL-IC |
|
PCB-167 |
Lemon Lane Landfill Shallow Groundwater Contour Map October 15, 1985Figure LL-2 |
|
PCB-168 |
Lemon Lane Landfill Proposed On-site Ground-water Monitoring Well Location Plot Plan October 15, 1985 Figure LL -3 |
|
PCB-169 |
Letter: Re: Westinghouse Lemon Lane Landfill Interim Remedial Measures Plan for Grading and Cover |
|
PCB-170 |
Report: Supplemental Hydrogeologic Investigation Plan Lemon Lane Landfill April 1986 |
|
PCB-171 |
Report: Interim Removal and Remedial Measures – Revision 1 Lemon Lane Landfill June 1986 |
|
PCB-172 |
Title Unknown (starts with a table of contents and 4.1 says “Illinois Central Spring (4811-01-1)) |
|
PCB-173 |
Ecological Assessment of PCB Contamination in the Illinois Central Spring/Quarry Springs complex for the Lemon Lane landfill superfund site, Bloomington, Indiana |
|
PCB-174 |
Memorandum: Conceptual Sampling Plan for Lemon Lane site Aril 11, 1995 |
|
PCB-174 |
Memorandum: Conceptual Sampling Plan for Lemon Lane site Aril 11, 1995 (copy 2) |
|
PCB-175 |
Title Unknown - Letter: fro m John Langley, PCB Project Coordinator to Dan Hopkins Remedial Project Coordinator (may 1995) |
|
PCB-175 |
Title Unknown - Letter: fro m John Langley, PCB Project Coordinator to Dan Hopkins Remedial Project Coordinator (copy #2) |
|
PCB-176 |
Letter: Lemon Lane 2st Quarter Residental Well Sample Results and Data Validation Summary November 21, 1995 |
|
PCB-177 |
Letter: From Robert Aten to Dan Hopkins |
|
PCB-178 |
Field sampling plan for the fill material at Lemon Lane Landfill: Westinghouse Bloomington Project AQPjP Volume II Amendment 1 August 21, 1996 |
|
PCB-179 |
Ecological Field Sampling Plan for the Lemon Lane Landfill October 21, 1996 |
|
PCB-180 |
Memorandum: Work Assignment No. 253-5BZZ, Lemon Lane Monitoring Well Analytical Results, Bloomington, Indiana |
|
PCB-181 |
Lemon Lane Landfill Waste and Soil Analysis for Samples Collected in November and December 1996 |
|
PCB-182 |
Summary of Lemon Lane Landfill Analytical results for Split samples collected by Earth Tech February 1997 |
|
PCB-182 |
Summary of Lemon Lane Landfill Analytical results for Split samples collected by Earth Tech February 1997 (copy #2) |
|
PCB-183 |
Amendment No. 2 to Quality Assurance Project Plan for Field Oversight of Site Investigation and Remedy Development Activities at the Lemon Lane Landfill Bloomington, Indiana |
|
PCB-184 |
Air monitoring logs Indiana woodtreating corporation TDD: T05-9210-040 PAN: EIN0251FBA OVA, MINI-RAM, & Explosimeter Readings |
|
PCB-185 |
Results of GC/MS Creosote Analysis Indiana Woodtreating Corporation site Concentrations reported in mg/Kg (ppm) Results Based on Dry Weight of Soil |
|
PCB-186 |
Enviornmental Protection Agency Office of Enforcement Chain of Custody Record Indiana Woodtreating Project No ZT1051 |
|
PCB-187 |
Bloomington Project Interim Storage Plan WTSD – TME – 121 REV 0 |
|
PCB-188 |
Memorandum: Joint Permitting Committee Report October 28, 1985 |
|
PCB-189 |
Letter: Interim storage plan for Winston-Thomas December 24, 1985 |
|
PCB-190 |
Bloomington Project Interim Storage Plan WTSD – TME-121 REV 1 January 9, 1986 |
|
PCB-191 |
191 - Consolidated Report on Westinghouse Revised Interim Storage Plan |
|
PCB-191 |
191 - Consolidated Report on Westinghouse Revised Interim Storage Plan (copy #2) |
|
PCB-192 |
Supplement to Revised Interim Storage Plan; Westinghouse Response to Environ Comments |
|
PCB-193 |
Project Safety Plan; Interim Removal and Remedial Measures; Bloomington Project; Westinghouse Electric Corporation; Bloomington, Indiana |
|
PCB-194 |
Bloomington Project Interim Storage Design Report June 9, 1986 |
|
PCB-195 |
Air Emissions Investigation for the Bloomington Interim Remedial Action Storage Facility, Bloomington, Indiana |
|
PCB-196 |
United States vs. Westinghouse, Civil Action No. IP 83-9-C; City of Bloomington vs. Westinghouse Civil Action No. IP 81-448-C (S.D. Indiana) |
|
PCB-197 |
197 - Westinghouse Electric Corporation Bloomington Project Interim Storage Design Report, June 9, 1986 |
|
PCB-198 |
198 – Project Safety Plan Interim Removal and Remedial Measures Bloomington Project Westinghouse Electric Corporation Bloomington, Indiana |
|
PCB-198 |
Project Safety Plan; Interim Removal and Remedial Measures; Bloomington Project; Westinghouse Electric Corporation; Bloomington, Indiana (Copy #2) |
|
PCB-199 |
Responsiveness Summary |
|
PCB-200 |
Title Unknown—Letter from Valdas V. Adamkus to Mayor Allison (February 19, 1987) |
|
PCB-201 |
Project Safety Plan; Interim Removal and Remedial Measures; Bloomington Project; Westinghouse Electric Corporation; Bloomington, Indiana—Project No. 85-152; April 1987 |
|
PCB-202 |
Inception of Interim Remedial Measures at Lemon Lane Landfill—Letter from Valdas V. Adamkus to Mr. Anderson (April 20, 1987) |
|
PCB-203 |
Bloomington Incineration Selection Basis |
|
PCB-204 |
Municipal Solid Waste (MSW) Incineration Gas Temperature/Residence Time Requirements |
|
PCB-205 |
Bloomington Simulation Testing; Test Report |
|
PCB-206 |
The National Incineration Testing and Evaluation Program: Two-Stage Combustion (Prince Edward Island) |
|
PCB-206 |
The National Incineration Testing and Evaluation Program: Two-Stage Combustion (Prince Edward Island) (copy #2) |
|
PCB-207 |
Incinerator Design and Approval Issues—Letter From Joseph Karaganis to Mr. Spracher (October 15, 1985) |
|
PCB-208 |
Westinghouse Application for Incineration Facility—Letter From Joseph V. Karaganis to Mr. Spracker (November 5, 1985) |
|
PCB-209 |
City of Bloomington Utilities Proposal for Engineering Services to Review Design Specifications for a High Temperature Incinerator; Novermber 8, 1985 |
|
PCB-210 |
Review Designs Specifications for Westinghouse Incinerator; November 11, 1985 |
|
PCB-211 |
Letter from D.E. Wolniak to Mr. Langley (November 11, 1985) |
|
PCB-212 |
Request for Information- Your Letter of November 14, 1985—Letter from Richard D. Ross to Mr. Langley (November 21, 1985) |
|
PCB-213 |
Letter from C. A. Anderson, Manager to Dr. Joseph Highland—Draft Protocol Document for Risk Assessment Associated With the Bloomington Incineration Facility; 28 January 1986 |
|
PCB-213 |
Letter from C. A. Anderson, Manager to Dr. Joseph Highland—Draft Protocol Document for Risk Assessment Associated With the Bloomington Incineration Facility; 28 January 1986 (Copy #2) |
|
PCB-214 |
Bloomington Incinerator Permit Application (February 11, 1986) |
|
PCB-215 |
Bloomington Incinerator Permit Application (February 11, 1986) |
|
PCB-216 |
Bloomington Incinerator Permit Application (February 17, 1986) |
|
PCB-217 |
Bloomington Incinerator Permit Application (February 17, 1986) |
|
PCB-218 |
Bloomington Incinerator Permit Application (February 17, 1986) |
|
PCB-219 |
Air Quality Permit Application Bloomington Incinerator—Letter from C.A. Anderson to Commissioner Maloley (April 10, 1986) |
|
PCB-220 |
Bloomington Sitting Report |
|
PCB-221 |
Operating History Survey of MSW Incineration Plants in the USA |
|
PCB-222 |
Abnormal releases from the Bloomington Incinerator during MSW-only operation (single train Development) 11/25/86 |
|
PCB-223 |
223 - Bloomington Incinerator Risk Assessment (December 1986) |
|
PCB-223 |
223 - Bloomington Incinerator Risk Assessment (December 1986) (Copy #2) |
|
PCB-224 |
224 - Bloomington Incinerator Risk Assessment Appendices (December 1986) |
|
PCB-224 |
Bloomington Incinerator Risk Assessment Appendices (December 1986) (Copy #2) |
|
PCB-225 |
225 – Bloomington Incinerator Permit Application |
|
PCB-226 |
226 - Fact Sheet Incineration of Hazardous Waste (Winter 1987) |
|
PCB-227 |
Permitting Hazardous Waste Incinerators (April 1988) |
|
PCB-228 |
Hazardous Waste Incineration: Questions and Answers |
|
PCB-229 |
Response to IDEM Comments on Bloomington Solid Waste Permit Application for Proposed Incinerator in Monroe County (May 27, 1988) |
|
PCB-230 |
Environmental Fact Sheet: Tighter Controls Proposed for Hazardous Waste Incinerators |
|
PCB-231 |
Incinerator Emission Limits—Letter from Dan Hopkins to Mr. Anderson (March 13 1990) |
|
PCB-232 |
NSPS/Commenced Construction—Letter from Dan Hopkins to Mr. Anderson (March 20 1990) |
|
PCB-233 |
Letter from Steve Rothblatt to Mr. Method (March 30 1990) |
|
PCB-234 |
Federal Register: Part II; Environmental Protection Agency (April 27, 1990) |
|
Title Unknown—Letter from Valdas V. Adamkus to Mr. McCloskey (June 19, 19??) | |
|
PCB-236 |
236 – TSCA/RCRA Incinerator Permit Application Volume 1: Section A through Attachment D-2-1 |
|
PCB-237 |
237 - TSCA/RCRA Incinerator Permit Application; Volume 2: Attachment D-5-1 through Section L |
|
PCB-239 |
239 - Application for Incinerator Certificate of Environmental Compatibility; Volume 1: Part 1 through Part 13 |
|
PCB-240 |
240 – Application for Incinerator Certificate of Environmental Compatibility Volume 2: Appendix 1-1 through Appendix 3-5 |
|
PCB-241 |
241 - Application for Incinerator Certificate of Environmental Compatibility; Volume 3: Appendix 4-1 through Appendix 7-3 |
|
PCB-242 |
242 – Application for an Air Quality Permit Westinghouse Bloomington Project July 1991 |
|
PCB-243 |
243 – RCRA Landfill Permit Application Volume 1: Section A through Section D August 1991 |
|
PCB-244 |
RCRA Landfill Permit Application; Volume 2: Attachment D-1 Landfill Design Report |
|
PCB-245 |
RCRA Landfill Permit Application; Volume 3: Attachment D-1 Landfill Design Report (Concluded) |
|
PCB-246 |
RCRA Landfill Permit Application; Volume 4: Attachment D-2 through Section E |
|
PCB-247 |
RCRA Landfill Permit Application; Volume 5: Attachment E-1 Hydrogeologic Site Characterization Report |
|
PCB-248 |
RCRA Landfill Permit Application; Volume 6: Attachment E-2 Hydrogeologic Data |
|
PCB-249 |
RCRA Landfill Permit Application; Volume 7: Attachment E-3 through Reporting and Record Keeping |
|
PCB-251 |
Application for Landfill Certificate of Environmental Compatibility; Volume 1: Part 1 through Part 13 |
|
PCB-252 |
Application for Landfill Certificate of Environmental Compatibility; Volume 2: Appendix 1-1 through Appendix 4-1 |
|
PCB-253 |
Application for Landfill Certificate of Environmental compatibility; volume 3: Appendix 5-1 through Appendix 7-2 |
|
PCB-254 |
Bloomington Project RCRA Landfill Permit Application—Letter from Louise K. Goeser to Mr. Method (June 2, 1992) |
