Libraries
 
Contact Information
  
last updated: 2/23/2010

Walls On Three Sides

<- last   home   next ->

 

 

The wall panel placement has reached the point here of framing the new addition on the west end and has turned the corner to begin the assembly of the long south wall of the new addition.  The long metal braces that are leaning against the wall panels are keeping the panels upright until the roof decking is installed.  The door opening at the bottom of the west wall is the door through which the ALF order picker vehicle will travel to the new dock area, where a battery charging station for the vehicle will be located.



last updated: 2/23/2010